Guided Installation: Prerequisites
Site survey completed
- Detailed site mapping - schematics and layout
- Finalized assets list with all required metadata
Customer meets defined criteria
- Site network is setup, tested and ready (WiFi/POE) for the first area
- Installer has an Android phone w/ installation app
- Electrical power is available for hardware
What happens next
Pre-installation
- Performed off-line by Augury
- Develop Installation Gameplan
- Installation flow
- Required resources
- Timeframe
- Augury platform setup
-
- Creating machines
- Creating site hierarchy
- Adding site users
-
- Installation training
Installation
- Performed on-site by you
- Mounting the devices
-
- Endpoints
- Nodes
- Routers if required
-
- Connecting the Devices
- Mapping endpoints to machines
- Mapping machines to nodes
Post-installation
- Performed off-line by Augury
- Validating connectivity
-
- Ensure all IoT devices are communicating
-
- Installation summary
- Machines baseline
What you should expect
Clear Installation Gameplan
- Work flow plan developed by Augury
- Daily pre and post check-ins
24/7 Augury support
- First 2 machines’ installation will be done live during the training
- Augury support will be available via chat/video/phone throughout entirety of the installation
Timeline
- 4 hours on-line training session (can be broken up into separate sessions)
- Estimated install time per machine 30 minutes
- Your operational schedule
Comments
0 comments
Please sign in to leave a comment.